2009 Maintenance Budget
2009 Building
Committee Budget
for
Maintenance and Repairs of Santa Fe Friends Meeting
Approved 12-21-08
Meetinghouse
-
Patch most conspicuous holes and stabilize major cracks in interior walls with mud; paint these as well as old Structolite patches $1000-1500
-
Patch and replaster the mud finish in the garage and entrance covered walk as needed $ 800
-
Explore alternatives to noisy heater in Meeting room $ 500-2000
-
Check and patch roof as needed $ 500
-
Continue project to reframe Olive Rush works with archival materials $ 500.00
Subtotal $3400-5300
Guest Apartment
-
Create more effective insert for hole in bathroom floor $ 100
Ramada/Casita
-
Misc. repairs and up-grades of electrical and heating $ 800
Grounds
-
Improve drainage on brick walkway on west side $ 800-$1000
-
Reconstruct/Restore original wooden doors at south end of garage $1000-1500 ?
$1800-2300 ?
____________
Total Proposal $6100-$8700
Long Range or Restoration Projects
-
Write grant to begin treatment of frescoes $1000-?
(All costs are rough estimates)
Prepared by Bettina Raphael and Dave Giltrow